Review Agenda Item
Meeting Date: 8/8/2022 - 7:00 PM
Category: Consolidated Motion
Type: Action
Subject: 13.10 Change Order #2D Between Mountain View Los Altos High School District and Atlas Pellizzari Electric to Provide Services Related to the Los Altos High School Student Services Building Project
LCAP (Local Control Accountability Plan) Goal:
Enclosure
File Attachment:
LAHS SS Bldg_Atlas Pellizzari Electric CO #2D_08.08.22.pdf
Summary: Mountain View Los Altos High School District is requesting Change Order #2D with Atlas Pellizzari Electric be ratified:
- Additional scope inclusions requested per District IT standards at the Los Altos Student Services project. These noted changes were discussed on a page turn meeting on Dec 2, 2021 and the following revisions were requested during the meeting:
• Item #1 – Provide Cat 6A cabling in lieu of Cat 6 for WAP locations. $10,522.00
• Item #2 – Change OFCI projector to OFCI LCD Display in Room U123. $1,042.00
• Item #3 - Remove pass thru plates and install AV device plates $1,506.00
• Item #4 – Provide backbone cabling to MDF in 700 Building. $15,861.00
• Item #5 – Provide (1) power/data poke thru device for Conf. Room 239. $4,558.00
• Item #6 – Provide (1) 25 pair copper backbone from Elevator to IDF. $5,465.00
• Item #7 – Add (38) 3D furniture flex drop locations and (4) WAP’s. $44,273.00
• Item #8 - Change the (2) IDF Cabinets to 2-Post racks and vertical managers. $3,335.00
- Repair or replace the existing fiber optic data line to the general contractors site trailer due to ongoing connection issues. Cost includes a new fiber optic line if required, as this data may not be repairable, but the issue may be at the connections, which will be troubleshot prior.
Funding: $84,026.00
Bond (change order is within budget)
Recommendation: Ratify Change Order #2D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project.
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:
Mike Mathiesen - Associate Superintendent
Signed By:
Nellie Meyer - Superintendent
Vote Results:

Original Motion
Member Debbie Torok Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #2D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Phil Faillace     Yes
Sanjay Dave     Yes
Debbie Torok     Yes
Catherine Vonnegut     Yes
Fiona Walter     Yes