Review Agenda Item
Meeting Date: 9/14/2020 - 6:30 PM
Category: Business/Action Items
Type: Info
Subject: 17.1 Public Hearing for Los Altos High School Expansion Preliminary Environmental Assessment
LCAP (Local Control Accountability Plan) Goal:
Enclosure
File Attachment:
COMPLETE PEA Report Los Altos HS Final Draft 081420 reduced.pdf
Summary: The Mountain View Los Altos High School District (MVLAHSD) has prepared a Preliminary Environmental Assessment (PEA) Report in accordance with Education Code section 17213.1, subdivision (a)(4)(B), in order to receive project approval by the Department of Toxic Substances Control (DTSC) for the Los Altos High School Expansion Project. The PEA investigation was conducted at the site to determine if any hazardous materials were released to the site during past activities. The PEA Report summarizes the results of the environmental investigation and makes recommendations for additional characterization of Site soils through a Supplemental Site Investigation.
The MVLAHSD has submitted the PEA Report to the DTSC for review and has chosen to make the PEA Report available for public review and comment pursuant to Education Code section 17213.1, subdivision (a)(4)(B
Funding:
Recommendation: Conduct a public hearing.
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:
Mike Mathiesen - Associate Superintendent
Signed By:
Nellie Meyer - Superintendent