|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
13.10 Change Order #2D Between Mountain View Los Altos High School District and Atlas Pellizzari Electric to Provide Services Related to the Los Altos High School Student Services Building Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #2D with Atlas Pellizzari Electric be ratified: - Additional scope inclusions requested per District IT standards at the Los Altos Student Services project. These noted changes were discussed on a page turn meeting on Dec 2, 2021 and the following revisions were requested during the meeting: • Item #1 – Provide Cat 6A cabling in lieu of Cat 6 for WAP locations. $10,522.00 • Item #2 – Change OFCI projector to OFCI LCD Display in Room U123. $1,042.00 • Item #3 - Remove pass thru plates and install AV device plates $1,506.00 • Item #4 – Provide backbone cabling to MDF in 700 Building. $15,861.00 • Item #5 – Provide (1) power/data poke thru device for Conf. Room 239. $4,558.00 • Item #6 – Provide (1) 25 pair copper backbone from Elevator to IDF. $5,465.00 • Item #7 – Add (38) 3D furniture flex drop locations and (4) WAP’s. $44,273.00 • Item #8 - Change the (2) IDF Cabinets to 2-Post racks and vertical managers. $3,335.00 - Repair or replace the existing fiber optic data line to the general contractors site trailer due to ongoing connection issues. Cost includes a new fiber optic line if required, as this data may not be repairable, but the issue may be at the connections, which will be troubleshot prior. |
|
|
Funding:
|
$84,026.00 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #2D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Debbie Torok Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #2D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|