|
|
|
|
|
|
Meeting Date:
|
11/17/2022 - 7:00 PM
|
Category:
|
Consolidated Motion
|
Type:
|
Action
|
Subject:
|
16.12 Change Order #10A Between Mountain View Los Altos High School District and Beals Martin to Provide Services Related to the Mountain View High School Student Services Building Project
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #10A with Beals Martin be ratified: - Provide and install approximately 200 linear feet of studs at the parapet area to increase parapet height, per Request for Information #321. - Per Division of the State Architect review, it was determined the railing glass thickness shall be changed and up sized. Due to the change, there will be more labor involved as the glass is heavier (to carry to the second floor, and to install), and there is a material cost difference for the glass and railings. - Per structural request, a metal plate shall be fabricated and installed at the intersection of a beam and column to improve structural integrity as shown on Architect Supplemental Instruction #55 and Construction Change Directive #27. - Per structural request, a metal (bent) plate shall be fabricated and installed at the trash enclosure (room) to support the deck and maintain structural integrity per Request For Information #369. - Due to an unprecedented increase in inflation in a brief time; For steel, electronics, freight and other components, there have been significant increases in material and labor costs. Therefore, following is additional cost for elevator material based on mentioned factors.
|
Funding:
|
$58,809.00 Bond (change order is within budget)
|
Recommendation:
|
Ratify Change Order #10A between Mountain View Los Altos High School District and Beals Martin to provide services related to the Mountain View High School Student Services Building project.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Irene Aguilar - Administrative Assistant
|
|
Signed By:
|
|
Mike Mathiesen - Associate Superintendent
|
|
Signed By:
|
|
Nellie Meyer - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Phil Faillace Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #10A between Mountain View Los Altos High School District and Beals Martin to provide services related to the Mountain View High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|