Meeting Date:
|
6/2/2022 - 7:00 PM
|
Category:
|
Consolidated Motion
|
Type:
|
Action
|
Subject:
|
10.9 Change Order #4D Between Mountain View Los Altos High School District and Best Electrical to Provide Services Related to the Mountain View High School Student Services Building Project
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #4D with Best Electrical be ratified: - Per District request, Contractor shall replace original specified IDF cabinet (2) with floor mounted 2 post rack, and provide CAT6A cabling at all (13) wireless access points in lieu of regular CAT6 per ASI 27.7 - Per District request, a copy machine, refrigerator and a coffee machine will be placed in the staff work room, therefore Contractor shall modify electrical requirements per RFP 6; furnish & install 2 dedicated receptacles to copy machine & refrigerator, 3 ground fault circuit interrupter for coffee machine/appliances (placed on counter) and a dedicated 208v circuit for insta hot water for the added sink - Per District request, Contractor shall add a total of 29 data outlets & cabling in admin and office areas, 1 exterior speaker and 3 mounting brackets for LCD display monitors. Cost includes material, labor to install and test items once completed - The electrical/telecom/signal shall be rerouted to stay within the required (manufacturers recommendation) length of cabling. Contractor shall furnish and install a new IDF cabinet, reroute conduits and terminate 18 security cabling at the new IDF, add power board, battery enclosure & Lenel intelligent controller per RFI 176.2
|
Funding:
|
$73,470.00 Bond (change order is within budget)
|
Recommendation:
|
Ratify Change Order #4D between Mountain View Los Altos High School District and Best Electrical to provide services related to the Mountain View High School Student Services Building project.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Irene Aguilar - Administrative Assistant
|
|
Signed By:
|
|
Mike Mathiesen - Associate Superintendent
|
|
Signed By:
|
|
Nellie Meyer - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Debbie Torok Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #4D between Mountain View Los Altos High School District and Best Electrical to provide services related to the Mountain View High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|