Review Agenda Item
1.1 Call to Order
2.1 Public Employee Appointment Pursuant to Government Code §54957 Personnel Action R
3.1 Public Comment on Items Scheduled for Discussion in Closed Session
4.1 Adjourn to Closed Session
5.1 Reconvene to Open Session
6.1 Pledge of Allegiance and Roll Call
7.1 Approval of the Meeting Agenda
8.1 Public Employee Appointment Pursuant to Government Code §54957 Personnel Action R
9.1 Board Member Reports
10.1 Student Board Member Reports
11.1 Recognition of September 2023 Students of the Month: Kara Chou, Los Altos High
12.1 Superintendent's Report
13.1 District Organizations: At regular Board meetings, a single spokesperson of each
14.1 Public Comment on Items Not on the Agenda
15.1 Items listed under Consolidated Motion are considered routine and will be approv
15.2 Personnel Report
15.3 Resolution 23/24-X: AB 361 State and Local Agencies: Teleconferences
15.4 SELPA Master Contract Agreement Between Mountain View Los Altos High School Dist
15.5 Memorandum of Understanding Between Mountain View Los Altos High School District
15.6 Change Order #17A Between Mountain View Los Altos High School District and Sausa
15.7 Quarterly Investment Report for Period Ending June 30, 2023
15.8 Resolution 23/24-8 Adoption of the Gann Appropriations
15.9 Agreement Between Mountain View Los Altos High School District and Fagen Friedma
15.10 Minutes for the Board of Trustees Regular Meeting Conducted on August 28, 2023
15.11 District Credit Card Amendment
15.12 Warrants, August, 2023
15.13 Gifts And Donations
17.1 2022-2023 Unaudited Actuals Financial Report Certification
17.2 MVLA Science Department Presentation
18.1 Board Suggestions for Future Board Reports/Meetings
18.2 Communications/Correspondence
18.3 Date, Time and Place of Next Meeting
18.4 Invitation to Tour Shoreline Community
19.1 Adjourn Meeting
Print
Meeting Date:
9/11/2023 - 7:00 PM
Category:
Consolidated Motion
Type:
Action
Subject:
15.6 Change Order #17A Between Mountain View Los Altos High School District and Sausal Corporation to Provide Services Related to the Los Altos High School Student Services Building Project
LCAP (Local Control Accountability Plan) Goal
:
Enclosure
File Attachment:
LAHS SS Bldg-Sausal CO #17A-09-11-23.pdf
Summary
:
Mountain View Los Altos High School District is requesting Change Order #17A with Sausal Corporation be ratified:
- Remove sunshades that were installed at the same height as the top of the entry doors per the design drawings and install beauty trim caps at the door and window frame.
- Provide labor, equipment, and material as needed to frame in an access panel for the smoke detector in the elevator shaft that is not shown on the plans but is required by the Elevator Contractor per their pre-inspection punchlist.
- Provide and install waterproof traffic coating at the 2nd floor stair “A” landing that was not called out on the drawings but has been added to improve the function and aesthetic appearance of the 2nd floor entryway. This will also match the floor finish at the rear balcony by stair “B”.
- Provide labor and material as needed to pull additional wire from the hinge through the door to connect electronic locksets at all doors that receive AD300 electronic hardware. The electrician had installed all wire to the door hinge but did not make the final connection to the hardware that was installed by Sausal.
Funding
:
$25,812.80
Bond (change order is within budget)
Recommendation
:
Ratify Change Order #17A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School Student Services Building project.
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:
Mike Mathiesen - Associate Superintendent
Signed By:
Nellie Meyer - Superintendent
Vote Results:
Original Motion
Member
Thida Cornes
Moved, Member
Catherine Vonnegut
seconded to approve the
Original
motion 'Ratify Change Order #17A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye:
4
Nay:
0
.
The motion
Carried
4 - 0
Sanjay Dave
Yes
Catherine Vonnegut
Yes
Thida Cornes
Yes
Esmeralda Ortiz
Yes
Powered By
ic-BOARD.com