Meeting Date:
|
5/23/2022 - 7:00 PM
|
Category:
|
Consolidated Motion
|
Type:
|
Action
|
Subject:
|
17.23 Change Order #1G Between Mountain View Los Altos High School District and Walschon Fire Protection to Provide Services Related to the Mountain View High School New Auxiliary Gymnasium Project
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #1G with Walschon Fire Protection be ratified: - Due to a conflict with the roof truss beams, the heating ventilation & air conditioning duct work in the auxiliary gym building must be modified (size of duct changed). As a result, the fire protection pipe (sprinklers) will be re-routed and adjusted accordingly. Branch line & headers will be added to provide adequate coverage. The fire protection line will also be relocated at the office and restroom to avoid conflict with the duct work and light fixtures. An additional fire line and sprinkler heads will also be furnished & installed. - Relocate the point of connection approximately 1 foot away from the unit to avoid a conflict with the heating ventilation and air conditioning unit. - There was a conflict with the pendent sprinkler and light as they were both intended to be in the same location per plans. Relocate to the next ceiling tile to avoid a conflict with the lights. - The main fire sprinkler line is on the same elevation as the heating ventilation and air conditioning system. Due to these unforeseen conditions, relocation was required on two locations to avoid conflicts with the unit.
|
Funding:
|
$9,864.20 Bond (change order is within budget)
|
Recommendation:
|
Ratify Change Order #1G between Mountain View Los Altos High School District and Walschon Fire Protection to provide services related to the Mountain View High School New Auxiliary Gymnasium project.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Irene Aguilar - Administrative Assistant
|
|
Signed By:
|
|
Mike Mathiesen - Associate Superintendent
|
|
Signed By:
|
|
Nellie Meyer - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Fiona Walter Moved, Member Debbie Torok seconded to approve the Original motion 'Ratify Change Order #1G between Mountain View Los Altos High School District and Walschon Fire Protection to provide services related to the Mountain View High School New Auxiliary Gymnasium project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|