Review Agenda Item
1.1 Call to Order
2.1 Public Employee Appointment Pursuant to Government Code §54957 Personnel Action R
2.2 Conference with Legal Counsel – Anticipated Litigation: Significant Exposure to L
3.1 Public Comment on Items Scheduled for Discussion in Closed Session
4.1 Adjourn to Closed Session
5.1 Reconvene to Open Session
6.1 Pledge of Allegiance and Roll Call
7.1 Approval of the Meeting Agenda
8.1 Public Employee Appointment Pursuant to Government Code §54957 Personnel Action R
8.2 Conference with Legal Counsel – Anticipated Litigation: Significant Exposure to L
9.1 MVLA Spotlight: Mountain View High School Boys Varsity Soccer Team and Coaches
9.2 Resolution No. 22/23-36: Recognizing and Celebrating National Bilingual/Multilin
10.1 Board Member Reports
11.1 Student Board Member Reports
12.1 Recognition of March 2023 Students of the Month: Chelsea Izaguirre Mancilla (Mou
13.1 Superintendent's Report
14.1 District Organizations: At regular Board meetings, a single spokesperson of each
15.1 Public Comment on Items Not on the Agenda
16.1 Personnel Report
16.2 Mountain View High School's Cultural Exchange Trip to Iwata, Japan April 7-17, 2
16.3 Mountain View High School's Robotics Competition Trip to Houston, Texas, April 1
16.4 Quarterly Report on Williams Uniform Complaints
16.5 Revision to the School Calendar for the 2023-24 School Year
16.6 Adult School Calendar for 2023-2024
16.7 Contract with E.L. Achieve Partnership for the 2023-2024 School Year
16.8 Change Order #6D Between Mountain View Los Altos High School District and Atlas
16.9 Contract Amendment #1 Between Mountain View Los Altos High School District and M
16.10 Contract Amendment #6 Between Mountain View Los Altos High School District and
16.11 Contract Amendment #6 Between Mountain View Los Altos High School District and
16.12 Contract Amendment #3 Between Mountain View Los Altos High School District and
16.13 Change Order #7B Between Mountain View Los Altos High School District and Rober
16.14 Declaration of Sale or Disposal of Surplus Property
16.15 Minutes for the Board of Trustees Meetings Conducted on March 13, 2023, March 7
16.16 Resolution 22/23-37: AB 361 State and Local Agencies: Teleconferences
18.1 Informational Update - Administrative Council
18.2 Proposed 2023-24 Salary Schedules for CSEA , DTA and Unrepresented
18.3 Revision of Board Policy 3555 - Nutrition Program Compliance (First Reading)
18.4 Board District Goals for 2023-2028
19.1 Items not Completed During the First Closed Session will be Carried Over to this
20.1 Board Suggestions for Future Board Reports/Meetings
20.2 Communications/Correspondence
20.3 Date, Time and Place of Next Meeting
21.1 The Board will Reconvene Open Session and Report Out Any Action Taken During Sec
22.1 Adjourn Meeting
Print
Meeting Date:
4/3/2023 - 7:00 PM
Category:
Consolidated Motion
Type:
Action
Subject:
16.8 Change Order #6D Between Mountain View Los Altos High School District and Atlas Pellizzari Electric to Provide Services Related to the Los Altos High School Student Services Building Project
LCAP (Local Control Accountability Plan) Goal
:
Enclosure
File Attachment:
LAHS SS Bldg_Atlas Pellizzari Electric CO#6D.pdf
Summary
:
Mountain View Los Altos High School District is requesting Change Order #6D with Atlas Pellizzari Electric be ratified:
- provide and install additional electrical items that were not shown on the electrical drawings but are required by Kone Elevator as discussed at the pre-con meeting with Kone’s superintendent on 2/1/23. Additional items needed are as follows: 120V
disconnect for seismic shutoff in the elevator machine room, (2) LED lights and (1) GFCI receptacle at the 2nd floor landing, dedicated circuits for lights and GFCI receptacle at the 2nd floor landing. Contractor shall also install (3) conduit runs from the control panel to the elevator shaft for power and low voltage controls wiring. All power & LV wiring will be provided and installed by Kone.
- provide and install all conduit and boxes required for the wall
mounted digital air flow adjusters that will be provided by the HVAC controls contractor at (31) locations throughout the building. Contractor is requesting to be compensated for this work due to confusion with the scope requirements and design documents during bid time and therefore did not account for this in their bid.
Funding
:
$34,772.00
Bond (change order is within budget)
Recommendation
:
Ratify Change Order #6D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project.
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:
Mike Mathiesen - Associate Superintendent
Signed By:
Nellie Meyer - Superintendent
Vote Results:
Original Motion
Member
Catherine Vonnegut
Moved, Member
Thida Cornes
seconded to approve the
Original
motion 'Ratify Change Order #6D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye:
5
Nay:
0
.
The motion
Carried
5 - 0
Phil Faillace
Yes
Sanjay Dave
Yes
Catherine Vonnegut
Yes
Thida Cornes
Yes
Esmeralda Ortiz
Yes
Powered By
ic-BOARD.com