Meeting Date:
|
11/17/2022 - 7:00 PM
|
Category:
|
Consolidated Motion
|
Type:
|
Action
|
Subject:
|
16.18 Change Order #4A Between Mountain View Los Altos High School District and Sausal Corporation to Provide Services Related to the Los Altos High School Student Services Building Project
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #4A with Sausal Corporation be ratified: - Extra form work on West side of building pad due to low building pad established and caused by McGuire & Hester, the solution is to add another form board on top of the existing ones approx. 6”. - Roof screen canopy material cost escalation. - Refabricate (3) hollow metal door frames that were originally made too large for the door openings due to conflicting information in the contract drawings. - Remove and reinstall framing at the 2nd floor deck as needed to align the wall with the 1st floor curb below. - Remove and reinstall framing as needed to accommodate the additional bent plate that is required at the roof to extend the metal stud framing. - Remove and reinstall framing to accommodate the bent plate modification at the roof. - Structural steel framing revisions at edge of deck conditions. - Provide additional engineering to produce shop drawings and calculations for the airfoil sunshade blades as requested by DSA. This is an added requirement by DSA that was not included in the contract drawings or specifications.
|
Funding:
|
$82,485.42 Bond (change order is within budget)
|
Recommendation:
|
Ratify Change Order #4A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School Student Services Building project.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Irene Aguilar - Administrative Assistant
|
|
Signed By:
|
|
Mike Mathiesen - Associate Superintendent
|
|
Signed By:
|
|
Nellie Meyer - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Phil Faillace Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #4A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|