|
|
|
|
|
|
Meeting Date:
|
5/23/2022 - 7:00 PM
|
Category:
|
Consolidated Motion
|
Type:
|
Action
|
Subject:
|
17.21 Change Order #6C Between Mountain View Los Altos High School District and MK Pipelines, Inc. to Provide Services Related to the Los Altos High School New Classrooms, Engineering Labs, and Auxiliary Gymnasium Project
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #6C with MK Pipelines, Inc. be ratified: - Furnish and install additional 240 lineal feet of 3" water lines. - Cost for Work Directive #30 was projected to be under $10,0000; however, additional expenses were incurred to lower utilities for lime treatment on T&M. - Install new catch basin and pipe due to added curb near planting area. - Due to condition and location of an existing pipe, a pressure test and backfill of trench was required for proper tie-in of existing line. - Install retaining wall with catch basin due to relocated bio retention wall footings within classroom courtyard and Tech building. - Reconstruction of existing catch basin in planter area and catch basin moved to new location. - Raise and install rainwater leaders from downspouts to collection boxes for all gutters and downspouts. - Fix existing downspouts and install new ones, to divert water from classroom building away from construction zone. Existing sewer clean-out box dug out at higher elevation to divert storm water from entering. - Install 4 yards of slurry at end of bore pit to fill void around 12' pipe. - Repair sewer leak from an existing pipe, which was leeching in native soil. - Repaired broken 10” water main pipeline with C900 pipe replacement and mechanical joint sleeves installed.
|
Funding:
|
$66,458.77 Bond (change order is within budget)
|
Recommendation:
|
Ratify Change Order #6C between Mountain View Los Altos High School District and MK Pipelines, Inc. to provide services related to the Los Altos High School New Classrooms, Engineering Labs, and Auxiliary Gymnasium project.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Irene Aguilar - Administrative Assistant
|
|
Signed By:
|
|
Mike Mathiesen - Associate Superintendent
|
|
Signed By:
|
|
Nellie Meyer - Superintendent
|
|
|
|
Vote Results:
|
Original Motion | Member Fiona Walter Moved, Member Debbie Torok seconded to approve the Original motion 'Ratify Change Order #6C between Mountain View Los Altos High School District and MK Pipelines, Inc. to provide services related to the Los Altos High School New Classrooms, Engineering Labs, and Auxiliary Gymnasium project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|