Meeting Date:
|
11/13/2023 - 7:00 PM
|
Category:
|
Consolidated Motion
|
Type:
|
Action
|
Subject:
|
17.11 Change Order #14D Between Mountain View Los Altos High School District and Best Electrical to Provide Services Related to the Mountain View High School Student Services Building Project
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #14D with Best Electrical be ratified: - Raise and repair 13 existing electrical and data boxes located in various locations outside of the Student Services building to accommodate the new concrete. In addition, Contractor shall run new underground conduit and run power to the new site light poles. This work is to be tracked via time and materials. - Hard wire the irrigation controller at the Student Services building instead of having this device plug into an outlet. Since the controller is located outside the building, in order to prevent this from being disconnected easily, we would like to hard wire the controller.
|
Funding:
|
$25,409.00 Bond (change order is within budget)
|
Recommendation:
|
Ratify Change Order #14D between Mountain View Los Altos High School District and Best Electrical to provide services related to the Mountain View High School Student Services Building project.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Irene Aguilar - Administrative Assistant
|
|
Signed By:
|
|
Mike Mathiesen - Associate Superintendent
|
|
Signed By:
|
|
Nellie Meyer - Superintendent
|
|
|
|
|
|
|
|