Agenda Item
Meeting Date:
2/15/2022 - 7:00 PM  
Category:
Consolidated Motion  
Type:
Action  
Subject:
15.6 Change Order #2L Between Mountain View Los Altos High School District and Scapes, Inc. to Provide Services Related to the Los Altos High School New Classroom, Engineering Labs & Auxiliary Gym Project  
LCAP (Local Control Accountability Plan) Goal:
 
Enclosure:
 
File Attachment:
LAHS CR_Scapes CO #2L_02.15.2022.pdf
21-22-25 Futility Resolution - LAHS CR & Gym - Scapes.pdf
 
Summary:
Mountain View Los Altos High School District is requesting Change Order #2L with Scapes, Inc. be ratified:
- Provide tree, shrubs, irrigation, and concrete for the classroom courtyard per District request.
- Replace backflow preventer which was stolen from storage site area for the classroom project per District request.
- Add Visqueen (polyethylene plastic sheeting) under bioswale at the classroom project in areas which are not shown on the plans.
- Add neighbor tree screening along the East drive for privacy screening. Furnish labor, equipment, and materials to add fifteen Cypress trees at 12 ft, includes off-haul, soil amendments, irrigation system, removal of boulders and one existing Elm tree per District request.
- Added landscape to existing pool area on the classroom project per District request.
- Added planter wall detail on the classroom project per District request.
 
Funding:
$47,128.00
Bond (change order is within budget)
 
Recommendation
Ratify Change Order #2L between Mountain View Los Altos High School District and Scapes, Inc. to provide services related to the Los Altos High School New Classroom, Engineering Labs & Auxiliary Gym project.  
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:  
Mike Mathiesen - Associate Superintendent
Signed By:  
Nellie Meyer - Superintendent
 
Vote Results:

Original Motion
Member Phil Faillace Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #2L between Mountain View Los Altos High School District and Scapes, Inc. to provide services related to the Los Altos High School New Classroom, Engineering Labs & Auxiliary Gym project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Phil Faillace     Yes
Sanjay Dave     Yes
Debbie Torok     Yes
Catherine Vonnegut     Yes
Fiona Walter     Yes