Agenda Item
Meeting Date:
8/26/2024 - 7:00 PM  
Category:
Consolidated Motion  
Type:
Action  
Subject:
15.12 Change Order #9D Between Mountain View Los Altos High School District and Cupertino Electric to Provide Services Related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement Project  
LCAP (Local Control Accountability Plan) Goal:
 
Enclosure:
 
File Attachment:
LAHS Facility & 500 Wing_Cupertino Electric_CO#9D_8.26.24.pdf
 
Summary:
Mountain View Los Altos High School District is requesting Change Order #9D with Cupertino Electric be ratified:
- Provide all labor, equipment, and material to complete the electrical changes in the 200 & 300 wing classroom as described in RFI 66 as follows: 1. Replace 3000 series wiremold with 4000 series (dual service for data/power) at the additional locations shown on the map to accommodate the Tel/data feed to the IDF room that was not shown on the contract drawings but was discovered when the existing wiremold was removed. 2. Relocate (74) existing electrical boxes to align with the new wiremold installation. 3.Remove (46) existing tel/data boxes no longer in use.
- Provide the labor and material needed to add homerun conduit for the canopy lights leading to building J300 electrical room.
- Furnish and install inverter to support the canopy lights for building J300.
 
Funding:
$44,406.00
Bond (change order is within budget)
 
Recommendation
Ratify Change Order #9D between Mountain View Los Altos High School District and Cupertino Electric to provide services related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement project.  
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:  
Mike Mathiesen - Associate Superintendent
Signed By:  
Eric Volta - Superintendent
 
Vote Results:

Original Motion
Member Phil Faillace Moved, Member Esmeralda Ortiz seconded to approve the Original motion 'Ratify Change Order #9D between Mountain View Los Altos High School District and Cupertino Electric to provide services related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0.
The motion Carried 4 - 0
   
Phil Faillace     Yes
Sanjay Dave     Yes
Catherine Vonnegut     Yes
Esmeralda Ortiz     Yes