Agenda Item
Meeting Date:
3/28/2022 - 7:00 PM  
Category:
Consolidated Motion  
Type:
Action  
Subject:
16.11 Change Order #1A Between Mountain View Los Altos High School District and Sausal Corporation to Provide Services Related to the Los Altos High School Student Services Building Project  
LCAP (Local Control Accountability Plan) Goal:
 
Enclosure:
 
File Attachment:
LAHS SS Bldg_Sausal CO 1A_03.28.22.pdf
 
Summary:
Mountain View Los Altos High School District is requesting Change Order #1A with Sausal Corporation be ratified:
- Added work to pothole and located slurry areas along the north joint trench per Geotechnical recommendations for footing at excavation zone of influence.
- Clean-out, de-water and de-mucking of newly excavated building footings during rain events between 12/14/21 through 1/5/22, per District request.
- Added structural steel roof revisions per CCD #19 and #21 due to DSA changes to roof structure and bearing loads alignments.
 
Funding:
$46,407.01
Bond (change order is within budget)
 
Recommendation
Ratify Change Order #1A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School Student Services Building project.  
Approvals:
Recommended By:
Signed By:
Irene Aguilar - Administrative Assistant
Signed By:  
Mike Mathiesen - Associate Superintendent
Signed By:  
Nellie Meyer - Superintendent
 
Vote Results:

Original Motion
Member Debbie Torok Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #1A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Phil Faillace     Yes
Sanjay Dave     Yes
Debbie Torok     Yes
Catherine Vonnegut     Yes
Fiona Walter     Yes