15.11 Change Order #3B Between Mountain View Los Altos High School District and Duran & Venables to Provide Services Related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #3B with Duran & Venables be ratified: - Provide labor and equipment for a demo of an additional 6” of unforeseen concrete section found around the planter walls by the J300 wing, as the plans only call for a demo of 4” of concrete. This concrete section is approximately 700 sq ft. - Provide the required labor, material, and equipment to chip the planter wall footing as described in the RFI response #009. |
|
|
Funding:
|
$26,261.71 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #3B between Mountain View Los Altos High School District and Duran & Venables to provide services related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Eric Volta - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Phil Faillace Moved, Member Esmeralda Ortiz seconded to approve the Original motion 'Ratify Change Order #3B between Mountain View Los Altos High School District and Duran & Venables to provide services related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Catherine Vonnegut | Yes | Esmeralda Ortiz | Yes | |
|
|
|
|
|
|