|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
18.6 Change Order #6K Between Mountain View Los Altos High School District and Mastria Painting to Provide Services Related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #6K with Mastria Painting be ratified: - Facility Repairs Inc 2: Provide labor to remove adhesive foam tape from the interior wood trim inside 20 classrooms in wings F200, J300, & M300. This adhesive tape is the residue from the existing wiremold demo, and it needs to be cleaned before the painter can start priming and painting the wood trim. - Facility Repairs Inc 2: Provide labor and material to prime and paint the fascia on three (3) buildings, F200, J300, and M300 wings. The new gutter installed at the fascia is not as wide as the previous one, thus leaving an unfinished space below the gutter on both sides of the buildings that will need to be painted. - Facility Repairs Inc 2: Provide the required labor and material to paint four (4) drinking fountain handrails before embedding those in concrete. |
|
|
Funding:
|
$25,440.00 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #6K between Mountain View Los Altos High School District and Mastria Painting to provide services related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Eric Volta - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Catherine Vonnegut Moved, Member Phil Faillace seconded to approve the Original motion 'Ratify Change Order #6K between Mountain View Los Altos High School District and Mastria Painting to provide services related to the Los Altos High School Facility Repairs Inc. 1&2 – 500 Wing Replacement project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Catherine Vonnegut | Yes | Thida Cornes | Yes | Esmeralda Ortiz | Yes | |
|
|
|
|
|
|