15.5 Change Order #17A Between Mountain View Los Altos High School District and Sausal Corporation to Provide Services Related to the Los Altos High School New Classroom, Engineering Labs, and Auxiliary Gym Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #17A with Sausal Corporation be ratified: - Cost to fix plaster soffit control joints due to backing not shown on drawings or layout. The plaster soffit control joint was repaired on all buildings with control joint run perpendicular to framing using a 6” 16GA metal plate installed over Densglass for additional support. This was most cost effect remedy. - Due to space constraints above the ceiling on the 2nd floor of the 2-story Classroom Building, (5) access panels were added to the ceiling to provide access to wiring and junction boxes. The ceiling needed to be reworked due to the limited space with existing mechanical, plumbing, electrical utilities, and additional access panels required. - To meet site conditions in the 2nd floor of the 2-story Classroom Building, additional framing and drywall soffits were needed for a ceiling and duct height conflict in Rooms #202 & #206. Also, the ceiling was lowered in room #201 for ductwork placement. - Revised and added door hardware from CCD due to removed door cores added back per ASI #11.0. This ASI added Plan sheet A-8.1., and Door hardware spec. 08 7100. - Lime treated soil excavation due to changes in soil placement per geotechnical consultant recommendations. Soil at bid set was listed as native and changed to lime treated soil, per District request. Final cost negotiated and from estimate at $42,902.86. - Using $30,000.00 of Allowance item A6 -- Additional repair work required on wall and canopies of Locker Room. Price includes removing trophy case, infill, stucco on exterior walls. Damaged roof trim was removed and patched. Due to the extensive damage, cost exceeded allowance cap by $1,464.10. - Cost Increase from ordering the kitchen equipment in 2021 that resulted in delays due to covid. Original contract for equipment was from 2020 and there is a cost delta between the years due to production cost increases and changes to previous models specified based on availability. - Added scope to demo existing roof required to install new curb and pan deck penetrations, insulation, and sheet metal to set condensing unit on roof of Gym for the mini split unit install by Marina mechanical. **see attachment for full details |
|
|
Funding:
|
$78,953.11 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #17A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School New Classroom, Engineering Labs, and Auxiliary Gym project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Fiona Walter Moved, Member Debbie Torok seconded to approve the Original motion 'Ratify Change Order #17A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School New Classroom, Engineering Labs, and Auxiliary Gym project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 | | | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|