|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
16.7 Change Order #9C Between Mountain View Los Altos High School District and Robert A. Bothman to Provide Services Related to the Los Altos High School Student Services Building Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #9C with Robert A. Bothman be ratified: - Provide labor, equipment, and material to remove, saw-cut damaged portion, and reinstall (below grade) concrete drain inlet boxes that were previously installed in September 2021 and damaged during the past several months of site work and heavy equipment activity. RGMK will continue to investigate how the damage occurred and the responsible party(ies). |
|
|
Funding:
|
$42,260.67 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #9C between Mountain View Los Altos High School District and Robert A. Bothman to provide services related to the Los Altos High School Student Services Building project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
 |
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Thida Cornes Moved, Member Catherine Vonnegut seconded to approve the Original motion 'Ratify Change Order #9C between Mountain View Los Altos High School District and Robert A. Bothman to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 3 Nay: 0. | The motion Carried 3 - 0 | | | Catherine Vonnegut | Yes | Thida Cornes | Yes | Esmeralda Ortiz | Yes | |
|
|
|
|
|
|