15.4 Change Order #11D Between Mountain View Los Altos High School District and General Lighting Service, Inc. to Provide Services Related to the Los Altos High School New Classroom, Engineering Labs & Auxiliary Gym Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #11D with General Lighting Service, Inc. be ratified: - Furnish labor and materials to install a starter motor in the staff restroom due to design omission and resistance to ducting system. - Furnish labor and materials to add custom wall cover plates for the AV projectors on the classroom project per District IT request due to bid set being passed through. - Furnish labor and materials to provide and install WAP (Wireless Access Points) brackets for the Gym interior and exterior at building S per District request due to better signal. - Provide material and labor to sack and patch North stairs at the locker room entrance per District request. - Furnish labor and materials to relocate two beam detectors and supply two new ones in the gym at building T. Additional work to install three smoke detectors per design omission. - Furnish labor and materials to remove the temporary power infrastructure and floor material to protect the floor in the gym per District request. - Furnish labor and materials to provide power for the air compressor and filter for the technology building S per District request. - Elevator room fire alarm device replacement due to water damage. Devices were not working after water damage event. - Per District request gym beam cages added to fire alarm beams to prevent balls from sounding fire alarm if obstructed or stuck in detector. |
|
|
Funding:
|
$91,125.00 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #11D between Mountain View Los Altos High School District and General Lighting Service, Inc. to provide services related to the Los Altos High School New Classroom, Engineering Labs & Auxiliary Gym project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Phil Faillace Moved, Member Fiona Walter seconded to approve the Original motion 'Ratify Change Order #11D between Mountain View Los Altos High School District and General Lighting Service, Inc. to provide services related to the Los Altos High School New Classroom, Engineering Labs & Auxiliary Gym project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|