14.22 Change Order #7B Between Mountain View Los Altos High School District and Duran & Venables to Provide Services Related to the Mountain View High School Auxiliary Gym Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #7B with Duran & Venables be ratified: - Replace (excavate wet soil, pump out water and install stabilizing fabric) wet soil with base rock (1500 square feet) to achieve required compaction level and to be able to install asphalt. In addition, contractor shall demo approximately 600 square feet of concrete sidewalk (due to it being used for construction entrance) and demo an additional (500 square feet) unforeseen asphalt and replace with base rock. |
|
|
Funding:
|
$80,212.50 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #7B between Mountain View Los Altos High School District and Duran & Venables to provide services related to the MVLA Freestyle Academy Classroom Buildings project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
 |
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
|
|