|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
14.3 Change Order #3D Between Mountain View Los Altos High School District and Atlas Pellizzari Electric to Provide Services Related to the Los Altos High School Student Services Building Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting Change Order #3D with Atlas Pellizzari Electric be ratified: - Provide and install (5) trailer mount generators as needed to maintain power to various cold storage units throughout campus, the gymnasium HVAC system, the science building, and the construction area during the campus wide MSB power shutdown on 11/22/22 to tie-in the new student services building. |
|
|
Funding:
|
$28,111.00 Bond (change order is within budget) |
|
|
Recommendation
|
Ratify Change Order #3D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Thida Cornes Moved, Member Sanjay Dave seconded to approve the Original motion 'Ratify Change Order #3D between Mountain View Los Altos High School District and Atlas Pellizzari Electric to provide services related to the Los Altos High School Student Services Building project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Catherine Vonnegut | Yes | Thida Cornes | Yes | Esmeralda Ortiz | Yes | |
|
|
|
|
|
|