16.14 Change Order #13A Between Mountain View Los Altos High School District and Sausal Corporation to Provide Services Related to the Los Altos High School New Classroom, Engineering Labs and Auxiliary Gym Project |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Mountain View Los Altos High School District is requesting approval of Change Order #13A with Sausal Corporation: - Add Access Ladder - Add Roof Access Hatch - Add railing at bioretention - Fire-rated HM Doors, Frames, Glass and install - Added bleacher attachments - Added Window Sill Angle Supports - Conflict at railing attachment - Added access doors - Stair C Bolt and Tread conflicts - Added backing - Added horizontal metal wall panel cover - Patch building R roof - Relocation of roof hatches to new location - Added canopy weld plates - Fixes for relocated electricity per cabinet layout discrepancy - Change culinary FEC - Additional drywall finish work required below writable surface - Additional cost for conversion to AD400 electronic door hardware - Add window opening limiters - Added window film in room 626 - Added work for sanitary napkin disposal - Operable partition opening add - Added hardware RFI 563 and 557 - Move gym curtain wall tabs - Added standby time for elevator subcontractor - Elevator room and bathroom frame and patch - Added sheet metal shroud for exposed conduits - Patch tile in restroom due to sanitary napkin disposal - Engineering wing door track fix due to HVAC duct conflict - Replaced damaged ceiling tiles |
|
|
Funding:
|
|
Recommendation
|
Approve Change Order #13A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School New Classroom, Engineering Labs and Auxiliary Gym project. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Irene Aguilar - Administrative Assistant |
|
Signed By: |
|
Mike Mathiesen - Associate Superintendent |
|
Signed By: |
|
Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Catherine Vonnegut Moved, Member Debbie Torok seconded to approve the Original motion 'Approve Change Order #13A between Mountain View Los Altos High School District and Sausal Corporation to provide services related to the Los Altos High School New Classroom, Engineering Labs and Auxiliary Gym project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Phil Faillace | Yes | Sanjay Dave | Yes | Debbie Torok | Yes | Catherine Vonnegut | Yes | Fiona Walter | Yes | |
|
|
|
|
|
|